Regeneration of a bridge with a hot-dip galvanized steel structure over 40 years old

Product Used: Rust-Anode Primer

Regeneration of a steel structure bridge Hot-dip galvanized over 40 years Zinc reloaded done in 2017 with our Rust-Anode-Primer® Technology Ministry of Transport (MTQ) Saint-Wenceslas, Qc.

 

Length: 722 ft                       Surface area: +/- 100,000 ft2

Presence of Zinc oxide, rust and corrosion

Surface preparation by sandblast SSPC SP-16

5 years later   (2022)

These projects might interest you...

REM support poles in Montreal

Cooling towers

CHÂTEAU FRONTENAC – DUFFERIN TERRACE GUARDRAILS